Analysis for Coastal Operational Resiliency
CSS assisted with planning and executing a demonstration of three decontamination technologies on a USCG vessel contaminated with a benign surrogate for anthrax.
Developing and Testing Response Plans for US Coast Guard Facilities and Equipment
EPA, the Department of Homeland Security, and US Coast Guard (USCG) worked together on the Analysis for Coastal Operational Resiliency (AnCOR) project. It involved field-level demonstrations to train USCG response personnel and test equipment that could be used following a biohazard emergency. CSS first assisted with planning and executing a demonstration of three decontamination technologies on a USCG vessel contaminated with a benign surrogate for anthrax. We wrote and reviewed quality, sampling, air monitoring, and safety plans for the demonstration. While onsite for the 4-week demonstration, we set up the test bed during all three phases; prepared sampling kits; collected multimedia samples during the tests; shipped samples to the analytical laboratory; and prepared sections of the final report.
In a follow-on AnCOR project, we helped plan and execute a Wide Area Demonstration (WAD) at Ft. A.P. Hill’s Urban Warfare Training Center. The month-long field demonstration focused on decontaminating USCG-related structures (buildings and docks), materials (ropes, buoys), and hard and soft surfaces (asphalt, concrete, gravel, and vegetation). CSS participated in small workgroups to develop the exercise framework, prepared the Sampling Plan, and coordinated with the data management team. We handled the logistics for the exercise, arranging for decontamination contractors, videographers, office trailers, personal hygiene units, and electrical generators. During the field test we placed senior technical staff onsite to assist with background sampling, surrogate application, pre- and post-decontamination sampling, and two types of decontamination. We placed 65 reference material coupons and supported the collection and shipment of another 700 samples for analysis.
Additional Projects
Cleaning Up the National Anthrax Attack
Challenge CSS working alongside of the U. S. Centers for Disease Control characterized the extent of building contamination and subsequently determined that the entire 100,000 foot building and contents would need to be decontaminated. A novel method needed to be developed and implemented for cleaning the massive number of mail pouches, packages and artifacts destined…
Harmful Algal Blooms (HABs)
We provide site-specific in situ monitoring coupled with predictive modeling, to provide an early warning system to advise health officials and resource managers on how to best focus their efforts to protect health and environment.
Ecologically Sound Offshore Wind Development
CSS helps set the standards for suitability modeling for offshore wind development, and assists in meeting regulatory standards for environmental resource protection.
Get in touch
Contact us to learn more about our projects, capabilities, solutions, and service offerings.